The business problem
Specialist systems, generalist maintenance records
Cooling and power infrastructure is monitored in detail by specialist systems, but the maintenance, contractor attendance and change records around it are often kept to a far lower standard — in spreadsheets, email threads and contractor PDFs. When an incident is reviewed, the engineering data exists and the operational record does not.
The IntelliGrid approach
An FM operational layer above specialist monitoring
IntelliGrid integrates with existing monitoring and DCIM rather than replacing it, and supplies the operational discipline around it: asset-level maintenance history, permit-controlled contractor access, evidenced work and full audit trail — with alarm correlation to reduce noise.
AI use cases
CRAC thermal anomalies
Capacity loss detected from supply and return temperature behaviour before rack impact.
UPS battery condition
Anomalies in battery and charging behaviour flagged between tests.
Alarm correlation
Related alarms grouped so genuine incidents surface from volume.
Sustainability opportunities
Cooling efficiency
Plant operation and setpoint strategy assessed against IT load.
Energy intensity
Facility consumption tracked against IT load for efficiency reporting.
Water use in cooling
Consumption monitored where evaporative cooling is used.
Challenges
What makes this environment demanding
Cooling
CRAC and chilled water systems where capacity loss escalates within minutes.
UPS and power
Uninterruptible supply, switchgear and distribution under continuous duty.
Generators
Standby readiness verified between statutory tests.
Temperature and humidity
Tight envelopes monitored at rack and room level.
Leak detection
Water in a data hall requiring immediate, procedural response.
Alarm volume
Large numbers of alarms where genuine events must not be lost.
Redundancy monitoring
N+1 or 2N status and the effect of any component out of service.
Change control
Every physical intervention documented and attributable.
Workflow
Controlled intervention in a live hall
STEP 1
Raise
Work identified from monitoring, predictive risk or a PPM plan.
STEP 2
Assess
Redundancy impact and risk to the hall evaluated.
STEP 3
Permit
Change approved with a defined window and method.
STEP 4
Access
Time-bound access issued to the named engineer.
STEP 5
Evidence
Work, readings and sign-off recorded against the asset.
Data centre facility KPIs
Metrics reported by the platform. Values depend on your operation.
Critical plant uptime
Cooling and power availability
Change compliance
Interventions performed under permit
PPM compliance
Statutory and manufacturer routines
Open high-risk items
Current predictive exposure
Business benefits
Connects with
Frequently asked
Does IntelliGrid replace DCIM?
No. Specialist DCIM and monitoring platforms remain in place. IntelliGrid operates as the facilities management layer above them — maintenance, work orders, contractor control, permits and audit trail — and integrates with those systems rather than duplicating their function.